| Upon arrival for the 2007 summer session Heidi and Clark had made everything ready to move forward on the Upper East Room. The two vertical beams still hold the Loft floor support beams. The joists lying across the two center beams of the Upper East floor are new and needed to be set into the beams. In the back corner of the Lower East North room are the joists salvaged from the old floor. The new stairway leads down to the passage to the Lower East side. | |||||||